High Volume Pumping Station,High Volume Pumping Station, ARI Valves Air Bleed Valves, Bray Butterfly Valves, Krohne Flowmeter, Hart Pressure Transmitter, Blackmer End Centrifugal Process Pumps, WEG 75kw Electric Motors, Summit CD4MCU Pump, Coerco Water Tanks 32,000L Capacity.
Asset Collections Procedure:
Assets are located on an active mining lease, as such retrieval and collection activities are required to be conducted in line with site procedures, under Work Health and Safety (Mines) Regulations (WHSR) 2022.
For any assets that require modification to be transported we will require a full medical prior to site access approval and inductions to be completed for persons conducting work on site.
" Kalium Lakes Site Entry Request Form
" Copy of your DL
" Pre employment medical (including a Drug and Alcohol Screening)
" Vehicle, tool, and equipment inspections; Vehicles are required to meet "Mine Spec" and carry as a minimum a First Aid Kit, Fire Extinguisher and UHF 2-way Radio.
" Verification of training and competence for persons conducting work on site.